WINTERIZE BUTTON
WINTERIZE BUTTON
Dynomite Diesel Individual Stock #8 LONG LEAD Injector for 99-03 7.3L Ford Powerstroke

Dynomite Diesel Individual Stock #8 LONG LEAD Injector for 99-03 7.3L Ford Powerstroke

SKU: DDP.AENEW   ITEM NO: 100410

Price: $300.00

Orders Placed Within
alert icon California Residents: Prop 65 Warning
WARNING: Cancer and Reproductive Harm
Visit: www.p65warnings.ca.gov

Description

Individual Stock #8 LONG LEAD Injector

Fitment

99-03 7.3L Ford Powerstroke

Note: This particular injector is solely intended for the #8 cylinder on some engines which came equipped with what’s known as a long lead injector installed in that cylinder. If you are unsure what your engine came equipped with or do not want to take the time to check then order DDP ADNEW for the #8 cylinder and the other seven cylinders if needed.

 

Additional information

Weight 4 lbs
Dimensions 10.5 × 3.5 × 3.5 in
Manufacturer Part Number

Brand

Engine

,

Warranty

1 Year

Make

Year

, , , ,

Item Compatibility List

Year Make Model Trim Engine Notes
2003 Ford E-350 Club Wagon Chateau Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-350 Club Wagon Chateau Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-350 Club Wagon XL Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-350 Club Wagon XL Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-350 Club Wagon XL Standard Passenger Van 3-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-350 Club Wagon XLT Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-350 Club Wagon XLT Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-350 Super Duty Base Cutaway Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-350 Super Duty Base Extended Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-350 Super Duty Base Standard Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-350 Super Duty Base Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-450 Super Duty Custom Cutaway 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-450 Super Duty Custom Stripped Chassis - Incomplete 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford E-550 Super Duty Custom Cutaway 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford Excursion Eddie Bauer Sport Utility 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford Excursion Limited Sport Utility 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford Excursion XLT Sport Utility 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-250 Super Duty Lariat Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-250 Super Duty Lariat Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-250 Super Duty XL Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-250 Super Duty XL Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-250 Super Duty XL Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-250 Super Duty XLT Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-250 Super Duty XLT Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-250 Super Duty XLT Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty King Ranch Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty King Ranch Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty Lariat Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty Lariat Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty Lariat Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty Lariat Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty XL Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty XL Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty XL Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty XL Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty XL Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty XLT Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty XLT Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty XLT Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty XLT Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-350 Super Duty XLT Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-450 Super Duty Base Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-450 Super Duty Lariat Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-450 Super Duty Lariat Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-450 Super Duty Lariat Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-450 Super Duty XL Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-450 Super Duty XL Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-450 Super Duty XL Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-450 Super Duty XLT Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-450 Super Duty XLT Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-450 Super Duty XLT Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-550 Super Duty Lariat Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-550 Super Duty Lariat Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-550 Super Duty Lariat Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-550 Super Duty XL Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-550 Super Duty XL Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-550 Super Duty XL Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-550 Super Duty XL Motor Home - Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-550 Super Duty XLT Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-550 Super Duty XLT Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2003 Ford F-550 Super Duty XLT Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-350 Econoline Club Wagon Chateau Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-350 Econoline Club Wagon Chateau Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-350 Econoline Club Wagon XL Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-350 Econoline Club Wagon XL Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-350 Econoline Club Wagon XLT Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-350 Econoline Club Wagon XLT Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-350 Super Duty Base Cutaway Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-350 Super Duty Base Extended Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-350 Super Duty Base Standard Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-350 Super Duty Base Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-450 Econoline Super Duty Custom Cutaway 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-450 Econoline Super Duty Custom Stripped Chassis - Incomplete 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford E-550 Econoline Super Duty Custom Cutaway 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford Excursion Limited Sport Utility 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford Excursion XLT Sport Utility 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-250 Super Duty Lariat Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-250 Super Duty Lariat Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-250 Super Duty XL Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-250 Super Duty XL Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-250 Super Duty XL Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-250 Super Duty XLT Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-250 Super Duty XLT Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-250 Super Duty XLT Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty Lariat Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty Lariat Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty Lariat Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty Lariat Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty XL Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty XL Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty XL Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty XL Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty XL Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty XLT Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty XLT Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty XLT Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty XLT Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-350 Super Duty XLT Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-450 Super Duty Lariat Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-450 Super Duty Lariat Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-450 Super Duty Lariat Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-450 Super Duty XL Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-450 Super Duty XL Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-450 Super Duty XL Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-450 Super Duty XLT Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-450 Super Duty XLT Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-450 Super Duty XLT Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-550 Super Duty Lariat Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-550 Super Duty Lariat Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-550 Super Duty Lariat Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-550 Super Duty XL Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-550 Super Duty XL Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-550 Super Duty XL Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-550 Super Duty XL Motor Home - Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-550 Super Duty XLT Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-550 Super Duty XLT Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2002 Ford F-550 Super Duty XLT Cab & Chassis - Extended Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-350 Econoline Club Wagon Chateau Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-350 Econoline Club Wagon Chateau Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-350 Econoline Club Wagon XL Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-350 Econoline Club Wagon XL Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-350 Econoline Club Wagon XLT Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-350 Econoline Club Wagon XLT Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-350 Super Duty Base Cutaway Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-350 Super Duty Base Extended Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-350 Super Duty Base Standard Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-350 Super Duty Base Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-450 Econoline Super Duty Custom Cutaway 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford E-450 Econoline Super Duty Custom Stripped Chassis - Incomplete 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford Excursion Limited Sport Utility 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford Excursion XLT Sport Utility 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-250 Super Duty Lariat Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-250 Super Duty Lariat Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-250 Super Duty XL Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-250 Super Duty XL Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-250 Super Duty XL Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-250 Super Duty XLT Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-250 Super Duty XLT Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-250 Super Duty XLT Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty Lariat Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty Lariat Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty Lariat Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty Lariat Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty XL Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty XL Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty XL Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty XL Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty XL Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty XLT Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty XLT Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty XLT Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty XLT Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-350 Super Duty XLT Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-450 Super Duty Lariat Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-450 Super Duty Lariat Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-450 Super Duty XL Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-450 Super Duty XL Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-450 Super Duty XLT Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-450 Super Duty XLT Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-550 Super Duty Lariat Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-550 Super Duty Lariat Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-550 Super Duty XL Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-550 Super Duty XL Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-550 Super Duty XL Motor Home - Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-550 Super Duty XLT Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2001 Ford F-550 Super Duty XLT Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Econoline Club Wagon Chateau Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Econoline Club Wagon Chateau Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Econoline Club Wagon Custom Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Econoline Club Wagon Custom Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Econoline Club Wagon XLT Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Econoline Club Wagon XLT Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Super Duty Base Cutaway Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Super Duty Base Extended Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Super Duty Base Standard Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Super Duty Base Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Super Duty XL Cutaway Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Super Duty XL Extended Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Super Duty XL Standard Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-350 Super Duty XL Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-450 Econoline Super Duty Custom Cutaway 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford E-450 Econoline Super Duty Custom Stripped Chassis - Incomplete 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford Excursion Limited Sport Utility 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford Excursion XLT Sport Utility 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-250 Super Duty Lariat Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-250 Super Duty Lariat Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-250 Super Duty Lariat Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-250 Super Duty XL Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-250 Super Duty XL Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-250 Super Duty XL Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-250 Super Duty XLT Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-250 Super Duty XLT Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-250 Super Duty XLT Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty Lariat Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty Lariat Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty Lariat Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty Lariat Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty Lariat Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty XL Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty XL Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty XL Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty XL Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty XL Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty XLT Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty XLT Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty XLT Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty XLT Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-350 Super Duty XLT Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-450 Super Duty Lariat Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-450 Super Duty Lariat Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-450 Super Duty XL Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-450 Super Duty XL Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-450 Super Duty XLT Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-450 Super Duty XLT Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-550 Super Duty Lariat Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-550 Super Duty Lariat Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-550 Super Duty XL Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-550 Super Duty XL Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-550 Super Duty XL Motor Home - Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-550 Super Duty XLT Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
2000 Ford F-550 Super Duty XLT Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Econoline Club Wagon Chateau Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Econoline Club Wagon Chateau Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Econoline Club Wagon Custom Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Econoline Club Wagon Custom Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Econoline Club Wagon XLT Extended Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Econoline Club Wagon XLT Standard Passenger Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Super Duty Base Cutaway Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Super Duty Base Extended Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Super Duty Base Standard Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Super Duty Base Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Super Duty XL Cutaway Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Super Duty XL Extended Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Super Duty XL Standard Cargo Van 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-350 Super Duty XL Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-450 Econoline Super Duty Base Motor Home - Cutaway 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford E-450 Econoline Super Duty Base Stripped Chassis - Incomplete 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford Econoline Super Duty Base Motor Home - Cutaway 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford Econoline Super Duty Base Stripped Chassis - Incomplete 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford Econoline Super Duty Custom Cutaway 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-250 Super Duty Lariat Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-250 Super Duty Lariat Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-250 Super Duty Lariat Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-250 Super Duty XL Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-250 Super Duty XL Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-250 Super Duty XL Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-250 Super Duty XLT Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-250 Super Duty XLT Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-250 Super Duty XLT Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty Lariat Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty Lariat Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty Lariat Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty Lariat Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty Lariat Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty XL Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty XL Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty XL Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty XL Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty XL Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty XLT Cab & Chassis 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty XLT Cab & Chassis 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty XLT Crew Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty XLT Extended Cab Pickup 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-350 Super Duty XLT Standard Cab Pickup 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-450 Super Duty Lariat Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-450 Super Duty Lariat Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-450 Super Duty XL Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-450 Super Duty XL Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-450 Super Duty XLT Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-450 Super Duty XLT Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-550 Super Duty Lariat Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-550 Super Duty Lariat Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-550 Super Duty XL Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-550 Super Duty XL Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-550 Super Duty XL Motor Home - Stripped Chassis 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-550 Super Duty XLT Cab & Chassis - Conventional 2-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
1999 Ford F-550 Super Duty XLT Cab & Chassis - Crew Cab 4-Door 7.3L 445Cu. In. V8 DIESEL OHV Turbocharged
Shopping Cart
0